{"id":1616,"date":"2026-10-10T08:21:00","date_gmt":"2026-10-10T07:21:00","guid":{"rendered":"https:\/\/www.rethinkconstruction.net\/?p=1616"},"modified":"2026-10-29T19:25:25","modified_gmt":"2026-10-29T18:25:25","slug":"europes-largest-carbon-capture-and-storage-plant-opens-in-the-netherlands","status":"publish","type":"post","link":"https:\/\/www.rethinkconstruction.net\/index.php\/2026\/10\/10\/europes-largest-carbon-capture-and-storage-plant-opens-in-the-netherlands\/","title":{"rendered":"Europe\u2019s largest carbon capture and storage plant opens in the Netherlands"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Yara has begun operations at its Sluiskil fertiliser and ammonia facility in the Netherlands, launching what is described as Europe\u2019s largest commercial carbon capture and storage (CCS) project. The project is designed to capture and liquefy up to 800,000 tonnes of CO\u2082 each year. The captured emissions will then be transported by ship to Norway, where the Northern Lights facility will inject them approximately 2,600 metres beneath the North Sea seabed for permanent geological storage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/www.innovationnewsnetwork.com\/europes-largest-carbon-capture-and-storage-plant-opens-in-the-netherlands\/73690\/\" target=\"_blank\" rel=\"noopener\">Innovation News Network<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Yara has begun operations at its Sluiskil fertiliser and ammonia facility in the Netherlands, launching what is described as Europe\u2019s largest commercial carbon capture and storage (CCS) project. The project is designed to capture and liquefy up to 800,000 tonnes of CO\u2082 each year. The captured emissions will then be transported by ship to Norway, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"pmpro_default_level":"","footnotes":""},"categories":[11],"tags":[],"class_list":["post-1616","post","type-post","status-publish","format-standard","hentry","category-emerging","pmpro-has-access"],"_links":{"self":[{"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/posts\/1616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/comments?post=1616"}],"version-history":[{"count":1,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/posts\/1616\/revisions"}],"predecessor-version":[{"id":1617,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/posts\/1616\/revisions\/1617"}],"wp:attachment":[{"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/media?parent=1616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/categories?post=1616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/tags?post=1616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}