{"id":1324,"date":"2025-07-10T22:42:00","date_gmt":"2025-07-10T21:42:00","guid":{"rendered":"https:\/\/www.rethinkconstruction.net\/?p=1324"},"modified":"2026-01-14T21:53:00","modified_gmt":"2026-01-14T20:53:00","slug":"tu-braunschweig-launches-digital-construction-site","status":"publish","type":"post","link":"https:\/\/www.rethinkconstruction.net\/index.php\/2025\/07\/10\/tu-braunschweig-launches-digital-construction-site\/","title":{"rendered":"TU Braunschweig Launches Digital Construction Site"},"content":{"rendered":"\n<p>The\u00a0<strong>Technische Universit\u00e4t Braunschweig<\/strong>\u00a0has inaugurated its new\u00a0<em>Digital Construction Site (DCS)<\/em>\u00a0research infrastructure, showcasing what the construction site of the future could look like. Featuring a six-meter-high large-format 3D concrete printer, an automated concrete mixing plant, mobile robots, tracking systems and a digital control center, the project aims to\u00a0<strong>advance digitalisation in construction<\/strong>, improve productivity and sustainability, and serve as a real-world testbed for integrated, automated building processes under actual construction conditions.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p><a href=\"https:\/\/www.heise.de\/news\/TU-Braunschweig-startet-Digitale-Baustelle-10477392.html\" target=\"_blank\" rel=\"noreferrer noopener\">Heise (in German)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The\u00a0Technische Universit\u00e4t Braunschweig\u00a0has inaugurated its new\u00a0Digital Construction Site (DCS)\u00a0research infrastructure, showcasing what the construction site of the future could look like. Featuring a six-meter-high large-format 3D concrete printer, an automated concrete mixing plant, mobile robots, tracking systems and a digital control center, the project aims to\u00a0advance digitalisation in construction, improve productivity and sustainability, and serve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"pmpro_default_level":"","footnotes":""},"categories":[],"tags":[],"class_list":["post-1324","post","type-post","status-publish","format-standard","hentry","pmpro-has-access"],"_links":{"self":[{"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/posts\/1324","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/comments?post=1324"}],"version-history":[{"count":1,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/posts\/1324\/revisions"}],"predecessor-version":[{"id":1325,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/posts\/1324\/revisions\/1325"}],"wp:attachment":[{"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/media?parent=1324"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/categories?post=1324"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rethinkconstruction.net\/index.php\/wp-json\/wp\/v2\/tags?post=1324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}